Project Details
The goal of this project was to provide a heated truck storage facility for winter storage, remove existing quonset building from the site, provide sanitary and water service to the facility, and collect roof storm water and convey it underground to the storm sewer system.
Services Provided
- 120' x 60' Heated Pre-Engineered Truck Storage Facility
- Heated Floor System
- Roof drain collection system consisting of 6 downspout risers and 320 LF of 6" PVC storm pipe
- Perimeter foundation drain tile system
- 195 LF - 2" water service line and appurtenances
- 180 LF - 4" sanitary service pipe with modifications to existing manhole to accommodate a drop situation
- 2,750 Ton - Aggregate Base Course
- 6,800 SF - Concrete flatwork
- Preliminary and Final Design
- Bidding
- Construction Administration