Project Details
Before construction began, the contractor diverted stream flow through a temporary diversion channel, allowing water to bypass the work area while maintaining downstream flow. Once the diversion was established and the project area isolated, an enclosed pool of water remained within the construction limits.
Banner's Environmental team completed multiple seine passes through the isolated pool to capture and safely relocate fish and other aquatic organisms before dewatering activities started. The team documented and relocated a variety of aquatic species, including turtles, shiners, minnows, sunfish, bullhead, crayfish, and freshwater mussels.
Following project completion, Banner will prepare and submit the required documentation to the U.S. Army Corps of Engineers to satisfy Section 404 permit requirements and associated Programmatic Section 7 Biological Opinion obligations. Through detailed field investigations, regulatory coordination, and technical reporting, Banner helps protect sensitive aquatic resources while supporting timely delivery of critical transportation infrastructure projects.