Two existing structures on County Highway 7 (north of Bruce, SD) had reached the end of their serviceable life and required replacement. Banner’s team performed the initial site surveys and hydraulic analyses to determine replacement structure types and sizes. After the replacement structure types and sizes were selected, Banner performed the final design of the replacement structures and preparation of the construction plans, including approach grading and guardrail.
Project Goal # 1
Remove and replace the two existing structures with structures that meets current standards for load capacity and safety
Project Goal # 2
Regrade approaches along with widening shoulders, bituminous surfacing and new guardrail at bridge site
Project Features
- New - 250'-0" 4-span prestressed girder bridge
- New - 3-12'x6' reinforced concrete box culvert
- 930' of newly graded and surfaced roadway
Services Provided
- Topographic/Legal Survey
- Hydraulic Analysis
- Load Rating Analysis
- Preliminary/Final Design
- Construction Documents