Watertown In-Town Lift Station Improvements
BAI Number: 21029.00.03
Bid Schedule: Unit Price Bid Schedule
Probable Construction Cost: $1,080,000.00 to $1,320,000.00
Deposit for Plans & Specs:
(Includes sales tax)
$47.70 (Half-size) - Refundable
$21.20 (Electronic) - Non-refundable
 
Project Bid Date: 12/04/2009
Project Bid Time: 11:00 AM
Project Bid Location: Finance Officer, PO Box 910, Watertown, South Dakota 57201
Project Deadlines: 09/30/2010 for substantial completion
10/29/2010 for final completion
 
Addendum Dates: 12/01/2009 Faxed - Click here to download
12/01/2009 Faxed - Click here to download
12/03/2009 Faxed - Click here to download
 
Additional Files: Pre-bid Meeting Minutes (11/25/2009)

Scope of Work:
  • Generally rehab 12 – Sanitary Sewer Lift stations
  • 12 pairs of lift station wet pit submersible pumps (HP motor sizes ranging from 3 to 30 HP)
  • Install approximately 700 LF of 4” PVC force main
  • Removal and Replacement of wetwells at lift stations 35 and 37
  • Removal and replacement of Valve Vaults at lift stations 35, 37, and 43
  • Structure and Trench Dewatering for new wetwells, valve vaults, and force main installation
  • Installation of 12 audible alarms
  • 6 wetwell covers including access frame and doors, remove and replace with new
  • Asphalt street, concrete driveway, surface restoration and other miscellaneous items
  • Electrical – Motor Starters for Lift station 36
  • Controls for lift station 26, 27, 29, 35, 38, and 42
  • Control panel enclosures for lift stations 27, 37, 28, 42
  • Electrical VFD’s for phase conversion at lift stations 29, 35, and 42
  • Electrical – Service disconnects at lift stations 26, 27, 29, 35, 36, 37, 38, 42, and 43
Contact Persons:
  • Civil- Kent Johnson, Banner Associates, Inc., 605-692-6342
  • Control - Justin Petersen, Banner Associates, Inc., 605-692-6342
  • Electrical - Mark Joffer, PE Group, 605-297-3647